Case studies
Our strongest card

Case studies with figures

Real projects, measured savings, confirmations signed by public-sector clients. For each we state what was measured and how. All the projects below are in Czechia, where we have been measuring longest. What transfers across borders is the method: the same before/after measurement on your own meter, and the same signed confirmation from the client.

All Hotels Healthcare Social care Public sector Education Households Signed by the client
Healthcare

Trutnov Hospital, Czechia

−13,65 %
water use · ≈ 22 200 € (544,679 CZK)/year · ROI ~10 months
Evidenced by measurementCase study →
Public sectorsigned

Pilsen — pilot summary (5 buildings)

−16,44 %
in total · ≈ 24 900 € (610,375 CZK)/year · best building −27.58 % · School 28, KS11, Čtyřlístek care home
Evidenced by measurementCase study →
Social caresigned

Čtyřlístek care home, Pilsen

≈ 19 500 €
saved per year · payback ~3 months · heat for hot water −26.37 % · part of the Pilsen pilot
Evidenced by measurementCase study →
Educationsigned

Primary school No. 28, Pilsen

−27,58 %
water use · ≈ 4 490 € (110,030 CZK)/year · starting flow 16 l/min · part of the Pilsen pilot
Evidenced by measurementCase study →
Public sectorsigned

Pilsen City Hall, KS11

−10,64 %
water use · ≈ 730 € (17,846 CZK)/year · smallest building in the pilot · part of the Pilsen pilot
Evidenced by measurementCase study →
Social care

OSTARA Cvikov, Czechia

−14,1 %
3 buildings · ~144 m³/year · ROI ~15 months (Liberec Region)
Evidenced by measurementCase study →
Social caresigned

Velké Hamry care home, Czechia

−20 to 25 %
≈ 14 286 € (350,000 CZK)/year · payback ~4 months · the largest water user among the region's care homes (~8,000 m³/year)
Evidenced by measurementCase study →
Social caresigned

Jablonecké Paseky care home, Czechia

−16,9 %
the longest measured series — almost a year of monthly readings · ≈ 5 714 € (140,000 CZK)/year · payback ~4 months
Evidenced by measurementCase study →
Hotels

BHP, Czechia — 6 hotels

30 %
of the cost of water and heating it · ROI ~9 months
Detail coming soon
Households

Energo-Chudoba, Czechia

Ministry
a partner project on household savings
Detail coming soon
Method: every case study states what was measured, over what period and at what scope. Percentages from different bases (buildings vs. households) cannot be added together or interchanged. Signed client confirmations are available to public contracting authorities; the remaining case studies we evidence by measurement. ⚠ For supplies and services the procurement rules ask only for a list of references (Art. 58(4) and Annex XII of Directive 2014/24/EU) — a signed confirmation is more than the law requires.
Want to be next?

Find out your saving potential

A no-obligation audit calculates the saving for your building.

Request an audit